Summary
Overview
Work History
Education
Skills
Websites
Interests
<Enter your own>
Assignments
Disclaimer
Timeline
Generic

ABHIJEET SINGH

DEPUTY MANAGER - PROJECTS -TECHNICAL
Tororo

Summary

Analytical and results-driven Mechanical Engineer with over 12 years of rich experience in project execution, operation & maintenance within the cement industry. Proven track record in managing complex installations, predictive maintenance programs, team leadership, and enhancing equipment reliability. Global exposure with assignments across India and East Africa. Strong background in cement plant machinery, vertical mills, and advanced troubleshooting techniques.

Overview

14
14
years of professional experience
4
4
years of post-secondary education
2
2
Languages

Work History

Deputy Manager -Projects

Tororo Cement Limited
02.2024 - Current
  • Leading technical project execution for brownfield and greenfield initiatives.
  • Coordinating contractors, OEMs, and internal stakeholders to ensure timely project delivery.
  • Projects -Technical
  • Improved team efficiency by streamlining processes and implementing innovative management strategies.
  • Created and maintained a strong team culture that promoted high levels of collaboration, employee satisfaction, and overall performance.

Project Coordinator - 2 MTPA Grinding Unit

Tororo Cement Ltd.
02.2022 - 03.2024
  • Kept projects on schedule by managing deadlines and adjusting workflows.
  • Developed comprehensive project plans, outlining scopes, timelines, deliverables, and milestones.
  • Supervised multiple projects from project start through delivery by prioritizing needs and delegating assignments.
  • Maintained accurate documentation of all projects, facilitating efficient audits and future reference.

Asst. Manager – Mechanical (O&M)

Tororo Cement Limited
09.2018 - 01.2022
  • Leading team of mechanical engineers & technicians for establishing plant maintenance program, predictive/preventive maintenance schedules, and ensuring maximum run-time of following machinery.
  • 03 Cement grinding circuits including a 160 TPH Vertical roller mill MVR 3750 C4 (Gebr. Pfeiffer), a 150 TPH centre shaft Ball mill (L&T) and a 100 TPH twin drive Ball mill (ThyssenKrupp Polysius).
  • Classifying circuits equipped with classifiers SLS 5000 BC, SEPOL & SAPEX from Gebr. Pfeiffer, ThyssenKrupp & FLS respectively, bag filters from Thermax, RIICO & Batliboi & bag house fans from Howden Flakt.
  • Material storage and transport circuits deployed with bucket elevators (chain & belt type both), belt conveyors, air slides, gates etc. from reputed companies.
  • Complete silo extraction & packing circuit including 06 Roto Packers -8 RSE – Haver & Boecker make with semi automatic truck loaders from CWS & Elecon.
  • Hot gas generator (Firetech), compressors (Atlas Copco – GA 110 VSD) & pump house.
  • Maintenance of Steel cord Belt Bucket Elevators for Silo feed (300 TPH) Supplied by Beumer.
  • Responsible for monitoring the inventory of maintenance supplies, spare parts and critical items to ensure items are available and maintaining an adequate reorder level.
  • Assuring the new installations/modifications are reliable, improving the plant reliability and ensure they are in-line with ISO Procedures and guidelines.
  • Maintaining the equipment in healthy condition by using condition monitoring and analysis.
  • Interacting with spare part suppliers for discussing technical details of outsourced spare parts.
  • Key role involvement in coordinating with the production department to schedule maintenance activities.
  • Executing cost saving measures to achieve substantial reduction in terms of equipment, manpower and machine utilization.
  • Handling the maintenance department in safety systems and assure compliance with safety, health, environment and security by subordinates as well as their conformity to operating procedures.
  • Overseeing sub-contractor activities for mechanical equipment installations in conformance with the design, drawings, and quality and construction schedules.
  • Assuring working consistency of different gearboxes performance by maintaining lubrication schedule.
  • Experienced in supervising mechanical workshop jobs.

Senior Executive - Customer Services (Erection)

Gebr. Pfeiffer (India) Private Limited
08.2013 - 08.2018
  • Administered maintenance/construction of cement plants and handling maintenance, troubleshooting and services of cement plants in coordination with other departments.
  • Oversaw erection & commissioning, of cement plant equipments including Vertical mills ( Cement, raw & coal), Material handling systems, Bulk handling systems, Rotating equipment, Silo systems including Bag house, Belt conveyors, Bucket elevators, Hammer crushers , Fans & blowers , Hot gas generators ( FBC type ) ,pumps , compressors etc.
  • Involved in a wide range of activities such as supervising plant commissioning/equipment test run for the rotary equipment’s, supporting project/program.
  • Assisting in commissioning of undertaken projects by applying logical modifications.
  • Providing technical advice to Gebr. Pfeiffer customers including commissioning, installing, maintenance and troubleshooting of products/equipments.
  • Acted as a primary contact for customers and assisted/supported systems such as engineering, procurement and project management to facilitate on-site customer deliverable.

Engineer - Project Management

Gebr. Pfeiffer (India) Private Limited
08.2012 - 08.2013
  • Releasing project specifications as per project schedule and reviewing the efficiency and effectiveness of service delivery.
  • Identify, analyze, prioritize, mitigate and communicate project risks and providing project support to senior project managers.
  • Helping the Contract Manager with the development of operating procedures.
  • Project Management, site deputation, planning & contract control.
  • Basic engineering, procurement assistance & review engineering.

Intern-Plant Maintenance & Operation

Neyveli Lignite Corporation Ltd.
05.2011 - 07.2011
  • To study and evaluate the working of CFBC (Circulated fluidized bed combustion boiler).
  • To analyse the importance of safe coal handling in thermal power plants.
  • To understand the CCR operation and communication.

Education

B. Tech. - Mechanical Engineering

Rajasthan Technical University
Kota, Rajasthan
08.2008 - 07.2012

Skills

  • Microsoft Office Tools
  • Autodesk AutoCAD
  • MS Project
  • Adaptability
  • Cost analysis and savings

    Performance improvements

Interests

Technology
Music

<Enter your own>

  • Passport Number: K4432762
  • ID Type: Passport
  • ID Number: K4432762
  • Date of Birth: 20th August, 1990
  • Nationality: Indian

Assignments

  • Nuvoco Vistas Corp Ltd., Nimbol, Rajasthan, India, Senior Executive- Customer Services-Erection, 2018-08-01
  • Sagar Cements Ltd., Bayyavaram, Andhra Pradesh, India, Senior Executive- Customer Services-Erection, 2018-05-01 to 2018-07-31
  • Bangur Cement Ltd., Suratgarh, Rajasthan, India, Senior Executive- Customer Services-Erection, 2018-01-01 to 2018-02-28
  • Emami Cement Ltd., Jajpur, Odhisha, India, Executive- Customer Services-Erection, 2017-12-01
  • Emami Cement Ltd., Panagarh, West Bengal, India, Executive- Customer Services-Erection, 2017-04-01 to 2017-11-30
  • Shree Cement Ltd., Semradih, Chhattisgarh, India, Senior Engineer - Customer Services-Erection, 2016-08-01 to 2017-01-31
  • Shree Cement Ltd. (Unit 10), RAS, Rajasthan, India, Senior Engineer - Customer Services-Erection, 2015-04-01 to 2016-06-30
  • Gebr. Pfeiffer (India) Private Limited, Rajasthan, India, Engineer - Project Management, 2013-08-01 to 2014-03-31

Disclaimer

I hereby declare that above given information is authentic to the best of my knowledge.

Timeline

Deputy Manager -Projects

Tororo Cement Limited
02.2024 - Current

Project Coordinator - 2 MTPA Grinding Unit

Tororo Cement Ltd.
02.2022 - 03.2024

Asst. Manager – Mechanical (O&M)

Tororo Cement Limited
09.2018 - 01.2022

Senior Executive - Customer Services (Erection)

Gebr. Pfeiffer (India) Private Limited
08.2013 - 08.2018

Engineer - Project Management

Gebr. Pfeiffer (India) Private Limited
08.2012 - 08.2013

Intern-Plant Maintenance & Operation

Neyveli Lignite Corporation Ltd.
05.2011 - 07.2011

B. Tech. - Mechanical Engineering

Rajasthan Technical University
08.2008 - 07.2012
ABHIJEET SINGHDEPUTY MANAGER - PROJECTS -TECHNICAL