Summary
Overview
Work History
Education
Skills
Certification
References
Disclaimer
Degree
Timeline
Generic
Sultan Zeb

Sultan Zeb

EIT Supervisor/Inspector
Shabqadar,102

Summary

Dynamic and detail-oriented Electrical Inspector and Supervisor with over 12 years of experience in high-stakes infrastructure projects across the oil & gas, water transmission, and power transmission sectors. Proficient in Construction supervision, testing, commissioning, hazardous area inspections, and technical documentation( Procedures, Method Statements and ITP), with a proven track record of ensuring compliance with international standards and safety regulations. Skilled in risk management, root cause analysis, Team Leading, result oriented, strong communication skills and continuous improvement methodologies to enhance project outcomes. Seeking a challenging role in a forward thinking organization where I can leverage my expertise to drive operational excellence, foster a culture of safety and quality, and lead teams to deliver outstanding results while advancing my professional growth and technical acumen.

Highly skilled Electrical Inspector and Supervisor with over 12 years of experience in commissioning, inspection, and overseeing large-scale infrastructure projects in the oil & gas, water transmission, and power transmission sectors. Currently leading electrical inspections on the Tilenga Project with TOTAL Energies and SINOPEC, I oversee complex systems, including offshore platforms, pipelines, and a Central Processing Facility (CPF) within Uganda's Murchison Falls National Park. Previously, I led commissioning activities for the Shuqaiq Abha Water Transmission System and the Yanbu Madina Water Transmission System, ensuring seamless deployment and operational readiness of critical infrastructure.

Overview

13
13
years of professional experience
3
3
Certification

Work History

EIT Inspectors Lead (Electrical, Instrumentation, and Telecommunications Inspectors Lead)

Sinopec International Petroleum Services Uganda
01.2023 - Current
  • Company Overview: The Tilenga EPSSC (Early Production and Surface Systems Completion) project is a critical initiative in Uganda’s oil and gas exploration sector.
  • Overseeing the quality assurance and quality control (QA/QC) processes for the electrical, instrumentation, and telecommunications (EIT) systems associated with the pipeline and wellhead installations.
  • Ensuring that all systems are installed, tested, and commissioned according to the highest industry standards and specifications.
  • Possess CompEx certification for inspecting hazardous areas.
  • Ensure equipment installation conforms to area classification drawings and complies with IEC 60079-14 and IEC 60079-17 standards.
  • Develop and prepare detailed ITPs to outline specific testing and inspection activities.
  • Create ITRs to document inspections and test results for compliance and record-keeping.
  • Compile and maintain checklists to ensure thorough inspections and adherence to safety and quality standards.
  • Review and evaluate engineering and procedural documentation to ensure compliance with industry standards and project specifications.
  • Suggest improvements or modifications to enhance inspection processes and safety measures.
  • Oversee comprehensive inspection procedures and method statements for electrical, instrumentation, and telecommunication systems.
  • Supervise and mentor a dedicated team of EIT inspectors.
  • Provide technical guidance and ensure the team is prepared for thorough inspections.
  • Collaborate with construction teams for the seamless integration of inspection activities within the project workflow.
  • Coordination with procurement teams, construction teams, and client representatives to align inspection activities with project goals.
  • Perform detailed risk assessments to identify hazards associated with electrical, instrumentation, and telecommunication systems.
  • Conduct inspections of EIT installations, including cable laying along pipelines, medium voltage installations, and fibre optic cable splicing.
  • The Tilenga EPSSC (Early Production and Surface Systems Completion) project is a critical initiative in Uganda’s oil and gas exploration sector.

Electrical Engineer

AL-RASHID TRADING & Contracting Company, Saudi Arabia
01.2021 - 09.2022
  • Responsible for ensuring that all engineering systems, equipment, and installations were inspected, tested, and verified in accordance with the project specifications, standards, and regulatory requirements.
  • Led a team of engineers in the testing of all electrical equipment, including power transformers, auxiliary transformers, medium and low voltage switchgears, UPS, and other critical electrical systems.
  • Conducted comprehensive testing, from solo runs of motors to final load tests, to validate the performance and reliability of electrical systems.
  • Documented all testing activities, results, and findings meticulously, providing detailed reports to project stakeholders.
  • Ensured compliance with project specifications, international standards, and safety regulations throughout the testing process.

Electrical Engineer – Electrical Power Equipment

SINOPEC INTERNATIONAL PETROLEUM SERVICES
03.2018 - 01.2021
  • Served as Senior Electrical Engineer to ensure installation/commissioning/Maintenance of Electrical Power Equipment’s for Yanbu Madina Water Transmission System-III.
  • Conducted testing for Distribution Transformers, Motor Soft Starters (ATT), and Motors up to 10.8 MW capacity.
  • Participated in planning electrical site activities, ensuring alignment with approved schedules.
  • Managed ABB MV & LV Switchgear Testing & Commissioning in Pumping stations and Tap-off Stations.
  • Oversaw the commissioning of MOCOTECH Soft Starters and TIEMIC Motors ranging from 1.8 MW to 10 MW.

Senior Protection /Testing & Commissioning Engineer

Delta Al Dhahran For Power Services
09.2014 - 03.2018
  • Responsible for Managing Team and Site responsibilities for carrying out 110 KV GIS breaker operating mechanism retrofits.
  • Carried out 110 KV CB testing before & After Changing of Operation Mechanism.
  • Implemented modifications in Local Control Cabinet scheme from Hydraulic Pump Mechanism to Spring Charged Mechanism.
  • Supported Main Contractor in preparing schedule of testing Medium Voltage Switchgear, distribution transformer.

Operation Engineer

Phydo-Khyber Pakhtunkhwa
10.2012 - 05.2014
  • Supervision and Controlling of whole Power house through SCADA.
  • Perform Analysis and Troubleshooting in case of any outage in the live network.
  • Identification and prioritization of faults via Network Alarms; taking decisive steps to ensure appropriate levels of response are applied for speedy fault resolution.

Education

Bsc. - Electrical Engineer

Bahauddin Zakriya University

Skills

  • Good Communication Skills
  • Decision Making Skills
  • Team Leading
  • Flexibility/Adaptability
  • Quick Learner
  • Supervision
  • Analytical
  • Collaboration with Team
  • MS Office, Power Point and Excel
  • English
  • Arabic
  • Various South Asian Languages

Certification

CompEx COPC Certified, 134221

References

  • Mohammad Hassan Abdullah, mohamed-hassan-abdallah.osama@external.totalenergies.com
  • Mouses Bedros, mouses.bedros@external.totalenergies.com

Disclaimer

I hereby declare that all the information mentioned above is true to the best of my knowledge.

Degree

Bsc. Electrical Engineer

Timeline

EIT Inspectors Lead (Electrical, Instrumentation, and Telecommunications Inspectors Lead)

Sinopec International Petroleum Services Uganda
01.2023 - Current

Electrical Engineer

AL-RASHID TRADING & Contracting Company, Saudi Arabia
01.2021 - 09.2022

Electrical Engineer – Electrical Power Equipment

SINOPEC INTERNATIONAL PETROLEUM SERVICES
03.2018 - 01.2021

Senior Protection /Testing & Commissioning Engineer

Delta Al Dhahran For Power Services
09.2014 - 03.2018

Operation Engineer

Phydo-Khyber Pakhtunkhwa
10.2012 - 05.2014

Bsc. - Electrical Engineer

Bahauddin Zakriya University
Sultan ZebEIT Supervisor/Inspector